Hotel Projects

Water Planet Hotel

The turnkey Hotel project WATER PLANET, in Alanya / Okurcalar was constructed and delivered in the short period of 6 months .

Located in an area of 62.415 m2, the architectural design, all mechanical and electrical works were carried out by BOTAM. At the beginning fo the project planning and design phase of the project BOTAM studied all available information regarding surrounding nature and the environmental factors of the location. And on the basis of this they designed solutions that make use of the natural resources and renewable energy sources, such as; the purification of waste water, hot water and heating by solar energy panelslow energy consuming LED lighting and other environmental friendly designed mechanical systems.

Although completed in a very short time, WATER PLANET HOTEL, with it's superior build quality, unique design and technical equipment, is still serving as one of the area's example for new hotels to be build.

Project Info

  • Starting date: October 2011
  • Completion date: April 2012
  • Number of Rooms: 330
  • Work done: Turn-key Hotel Construction
  • Client: Oyunsu
  • Location: Okurcalar / Alanya / Antalya
  • Reference: Okan Soylu / General Manager / Oyunsu | Water Planet